Pranav Bhave

Checks, review dates and pending work

Check outcomes and overdue reviews stay distinct from scientific truth.

Latest full check: UNKNOWN — checking GitHub.

GitHub is read when this page opens. A failed or unavailable request shows UNKNOWN. No workflow result establishes scientific validity.

Exercise the failed and unavailable preview states · Inspect scientific check coverage · What receipts and checks establish

Review queue

Claim review dates are calculated from the registry's last review plus its review window. Recorded renewals retain the earlier deadline, calculated from the pinned registry revision. Other dated promises come from the publication list. Static snapshot: 2026-10-17; JavaScript updates labels against today's date in New York.

Research pipeline

Published result — claim registration pending · observed 2026-10-17

E9 — 1,000-item scoped result

E9’s 1,000-item result merged in PR 26. A post-result claim registration, E9-001, is proposed in draft PR 31 and is not in the registry. The result is not a completion of E2 and does not establish deployment safety.

The result discloses a verdict rule outside readable preregistration prose, selected pools, omitted calibration uncertainty and no independent replication. Its interval excludes zero but does not lie wholly beyond the 0.05 effect-size threshold.

Read the pinned result · Inspect publication record

Observed revision 592ed515dc78acd4034a055024a64003e93d4172. This board is a dated observation, not a live claim that the repository is unchanged.